Pool design and construction is a complex engineering process. A properly planned project is not only a source of comfort but also a long-term investment that significantly increases the value of your real estate.

Planning and Location – Where Does Quality Begin?

The first stage determines the location of the pool and its type:

  • Skimmer pool: Water filtration occurs from the surface through a special device called a skimmer.
  • Overflow pool Water overflows from the edges into a channel, passes through a compensation tank, and returns to the system.

Engineering Project – A Guarantee of Safety

Many clients view this stage as an additional expense, but in reality, it is the engineering drawings that determine the durability of the pool. The project includes:

  • Reinforcement schemes and concrete grades.
  • Planning of communication networks and waterproofing systems.

Main Phases of Construction

A quality result depends on construction precision:

  1. Site preparation: Excavation of the pit and pouring of the foundation slab.
  2. Monolithic pouring: Maintaining geometric precision is critical to avoid additional costs for leveling the walls.
  3. Insulation External waterproofing of the reinforced concrete structure (except for EPS forms).

Finishing: Why do we choose PVC liner?

In modern practice PVC membrane (liner) It is much more effective compared to tiles:

  • Durability: It does not crack and does not require annual repairs (unlike tiles, which often fall off).
  • Waterproofing: The liner itself is the best waterproof solution.
  • Design: A wide selection of colors and effects allows you to create your desired water aesthetic.